Lincoln Southeast High School

Lincoln, NE – PK-12 Project

A renovation, addition, and IAQ overhaul was done while the facility was in-use. A new high efficiency geothermal heat pump system was put in to heat and cool the facility, and a new Direct Digital Controlled (DDC) building management system was put in place to provide energy savings. Individual zoning of classrooms allowed a temperature control sensor tied to that individual zone to be linked to the building management system, to allowed individual zones to be heated and cooled for student comfort. Outdoor air was introduced to the facility and heat recovery was used to recapture exhausted energy. New energy efficient lighting was specified throughout the entire facility. The telecommunications wiring was updated and new general purpose receptacles were added.